Lots has changed since our last picture post. We have all done a lot of work in the house since then.
The framed stairs were added,
The Plummer came out and completed the rough in.
He then informed us that code required that a certain window can't be a type that opens due to the sewer vent just a few feet away.
The chimney was taken down to the floor,
rebuilt through the second floor,
and through the roof.
The HVAC and electrician have been out to do the rough in.
The front gable and bay window have been added,
and the roofers have finished their work, the upstairs windows have been added.
We are currently working in the kitchen putting in a new floor and stripping wall paper. (Sorry, no photos yet)
If all goes well, we will pass the framing inspection on Monday and we will then be able to get the insulation and drywall started.
Friday, March 21, 2008
Subscribe to:
Post Comments (Atom)
2 comments:
hi was just seeing if you minded a comment. i like your website and the thme you picked is super. I will be back. 3d innovations - renovation singapore
If you're looking for the Best Home renovation company in Melbourne then you've come to the right place. At OT Home renovations we offer a simple, easy to use, and seamless home renovation experience. Contact us today!
Post a Comment